News
Nanaimo Port Theatre Electrification

Retrofit Vendor Prism Engineering supported Port Theatre to reduce its greenhouse gas (GHG) emissions through Low Carbon Electrification (LCE) measures. The rooftop, air-cooled screw chiller had reached its end-of-life. Prism redesigned the heating system with a heat recovery, air-to-water variable refrigerant flow (VRF) system to provide primary heating for the building, recovering heat from the theatre during shows. Replacing the existing chiller with a heat pump system eliminated natural gas consumption to heat the building, leading to GHG savings of 98 tonnes eCO2, or 90% of the building’s emissions.
Learn more: Prism Engineering Port Theatre
Disclaimer: This content is shared in partnership with Prism Engineering. The views expressed in the source articles are those of Prism Engineering and do not necessarily reflect those of AEEA.
Prism Engineering
Consultant

Services
Assessments, Commissioning & operations, Design, engineering, Feasibility, Procurement, project delivery
Specialization
Audits, Building condition, Building operation handover & training, Building systems design, Business case, Electrical engineering, Embodied carbon, Green building certifications, Life cycle & capital planning, Measurement & GHG verification, Mechanical engineering, Modelling & simulation, Portfolio assessments, Procurement & contracts, Project management, Renewables, Utility analysis
Service area
Central Alberta, Northern Alberta, Southern Alberta, Western Canada