With a LEED Silver design mandate, Retrofit Vendors FWBA Architects, Ward Bros Construction and Spider Electric achieve LEED Gold on the Tilley replacement school
With a LEED Silver design mandate, Retrofit Vendors FWBA Architects, Ward Bros Construction and Spider Electric achieve LEED Gold on the Tilley replacement school
Retrofit Vendors Westcor Construction, TYZ Engineering and Group2 Architecture deliver the LEED Silver Buffalo Rubbing Stone school.
AEEA Retrofit Vendor Flynn Group utilizes its modular Speedwall building envelope system to achieve Passive House performance for BCIT’s unique needs.
Retrofit Vendors Delnor, Englobe, RJC and SMP collaborate through Integrated Project Delivery to build Soraya Hafez School for Edmonton Public Schools.
Optiem’s retrofit-ready technology provides real-time, asset-level energy monitoring and advanced analytics
Retrofit Vendors Timcon Construction and Group2 upgrade exterior insulation, windows and HVAC systems in the 40- 60 year old Red Deer City Hall.
Neu-Lite contributes to a lower carbon Alberta with the design and installation of a 1.2 MW solar array for the Evergreen Colony at Taber Alberta.
AEEA Retrofit Vendors Group2, Shunda Consulting and Construction Management, and Williams Engineering deliver a LEED Gold K-9 school in Lacombe for St. Thomas Aquinas School Division.
From office insulation to steam boilers, a leading Canadian provider of automation solutions is finding energy savings across its Alberta facilities.
Low-cost and no-cost changes make impact for airport.
Primaris achieves huge electricity savings at Fort McMurray mall.
Triovest lowers the operating costs of its Edmonton commercial real estate holdings by being strategic about energy management.